Integration Project Systems and Control 2013 Group 4: Difference between revisions

From Control Systems Technology Group
Jump to navigation Jump to search
Line 37: Line 37:
| - Qualitative analysis of robot  
| - Qualitative analysis of robot  
|-  
|-  
| - Derivation of kinematics and dynamics
| - Derivation of kinematics and dynamics (Leroy, Erik)
|-
|-
| - Preparation of first experiment session
| - Preparation of first experiment session (Wouter, Koen)
|-
|-
| - Investigate different control-design
| - Investigate different control-design
|-
| - Group meeting
|-
|-
|'''Feb 25 - Mar 3''' ||  
|'''Feb 25 - Mar 3''' ||  
|-
|-
| - Experiments (FRF-measurement, joint resolution, workspace, friction etc.)
| - Experiments (FRF-measurement, joint resolution, workspace, friction etc.) (Leroy, Wouter)
|-  
|-  
| - Design of feedback-control
| - Design of feedback-control (All)
|-
| - Group meeting
|-
|'''Mar 4 - Mar 10''' ||
|-
| - Feedback-control Experiments(Erik, Koen)
|-
| - Discuss feedforward-control (All)
|-
|-
| - Group meeting
|}
|}



Revision as of 17:07, 19 February 2013

Group Members

Name: Student id: Email:
Koen Gruntjens 0760934 k.g.j.gruntjens@student.tue.nl
E. van Broekhoven 0637413 e.c.v.broekhoven@student.tue.nl
W. Geelen 0744855 w.geelen@student.tue.nl
L. Hazeleger 0651762 l.hazeleger@student.tue.nl

Planning

Week:
Feb 18 - Feb 24
- Qualitative analysis of robot
- Derivation of kinematics and dynamics (Leroy, Erik)
- Preparation of first experiment session (Wouter, Koen)
- Investigate different control-design
- Group meeting
Feb 25 - Mar 3
- Experiments (FRF-measurement, joint resolution, workspace, friction etc.) (Leroy, Wouter)
- Design of feedback-control (All)
- Group meeting
Mar 4 - Mar 10
- Feedback-control Experiments(Erik, Koen)
- Discuss feedforward-control (All)
- Group meeting

Progress

Week 1

  • List of what you have done and learned
  • ...

Week 2

  • ...