File:Final Design.jpg: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
(No difference)
|
Latest revision as of 15:56, 1 April 2023
This is the final design of the project. It uses two different dynamically adjusting lines connected to a concrete slab that would be placed at the bottom of the coral reef. The diver is connected between the two lines such that it is unable to tangle with the lines
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 15:56, 1 April 2023 | 1,752 × 3,504 (158 KB) | L.tepavcevic@student.tue.nl (talk | contribs) |
You cannot overwrite this file.
File usage
The following page uses this file: