Embedded Motion Control 2014 Group 1/Meeting 20140514

From Control Systems Technology Group
Revision as of 10:28, 26 May 2014 by S101840 (talk | contribs)
Jump to navigation Jump to search

Meeting 2

date: 14-05-2014 (16.00-17.00)

The maze file is up and running. Some fine tuning needs to be done. Thursday evening tests will be done with pico.