PRE2018 3 Group11:Organization

From Control Systems Technology Group
Revision as of 13:30, 11 February 2019 by S160823 (talk | contribs) (Initial structure of the organizational page (group composition, deliverables, milestones, task division, planning, log))
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Group Composition

We explain the composition of our group. We can do this in textual format, or include a table. I (daniel) believe it is a nice idea to do this textually. That way, we can include information on strong and weak points as discussed in the meeting.

Deliverables

These are the main things that must be done by the end of the project.

Milestones

These are the deliverables split up into smaller tasks that we can set deadlines for.

Task division

Who will work towards what milestone/deliverable.

Planning

The planning of the whole project should include deadlines for each of the deliverables and milestones that were established. We can change this as time goes on.

Log

A weekly log of the things we have done.