Group Members
Planning
Week:
|
Activities:
|
Feb 18 - Feb 24 |
|
Obtain robot specifications such as motor saturation (Frank - 4 hours). |
|
Rens / Jeroen Design FRF measurement white noise injection and conduct the measurement 6 hours 2x. |
|
Jazz Make a selection of useful literature for the other group members 5 hours. |
|
Feb 25 - Mar 3 |
|
Frank Design of kinematic model (not sure yet if needed) 8 hours |
|
Rens / Jazz Analyze FRF data 8 hours 2x |
|
Jeroen Determine optimal algorithm: PID, LQG, H1, MPC or ILC 4 hours |
|
Mar 4 - Mar 10 |
|
All Design controllers based on chosen algorithm for four axises separately (loop shaping) feedback and feedforward 8 hours 4x |
|
Mar 11 - Mar 17 |
|
Jazz / Rens Test/tune designed controllers on the machine 5 hours 2x |
|
Jeroen / Frank Design optimal trajectory 8 hours 2x||
|
Mar 18 - Mar 24 |
|
Frank / Jeroen Test optimal trajectory on the machine 3 hours 2x |
|
Rens / Jazz Make presentation + solving unexpected problems 3 hours 2x |
|
Apr 1 - Apr 7 |
|
Progress
Week 1
- List of what you have done and learned
- ...
Week 2