0LAUK0 PRE2016 3 Groep10 Planning

From Control Systems Technology Group
Jump to navigation Jump to search

Planning

Gantt chart

Gantt Chart Group10.jpg

Deadlines

  • Presentations
    • Presentation 1: February 13, 2017
    • Presentation 2: February 20, 2017
    • Presentation 3: April 03, 2017
  • End-term evaluation (peer-review): April 03, 2017
  • Finalize final design: April 03, 2017
  • Finalize Wiki-page: April 13, 2017

The stated deadlines will all be graded.

Milestones

  • Literature study (resp.)
    • USE-aspects
    • Research
    • Technical information
    • Completed Wiki-page
  • Final design (resp.)
    • Description (with i.e. preliminary model)
    • Speech recognition (A.I.)
    • Completed final design

Deliverables

  • iOS-application (interface)
  • Speech recognition component

As final deliverable, an iOS-application will be made, which is able to propose questions to possibly injured elderly and give a proper response by making use of natural language processing.

Task division

The group has been divided into three seperate subgroups, which all independently focusses on different subjects, having their own tasks. This is needed to realize an integrated product of our final design at the end. Therefore, the group has been splitted up in such a way, that the subgroups will independently take care of the hardware, the software or the information page of our design.

  • Software
    • Bram
    • Pieter
  • Hardware
    • Steef
    • Man-Hing
  • Information page
    • Ken
    • Everyone

Others

Back to homepage