0LAUK0 PRE2016 3 Groep10 Planning
Jump to navigation
Jump to search
Planning
Gantt chart
Deadlines
- Presentations
- Presentation 1: February 13, 2017
- Presentation 2: February 20, 2017
- Presentation 3: April 03, 2017
- End-term evaluation (peer-review): TBA
- Finalize final design: April 03, 2017
- Finalize Wiki-page: April 03, 2017
The stated deadlines will all be graded.
Milestones
- Literature study (resp.)
- USE-aspects
- Research
- Technical information
- Completed Wiki-page
- Final design (resp.)
- Description (with i.e. preliminary model)
- Speech recognition (A.I.)
- Completed final design
Deliverables
- iOS-application (interface)
- Speech recognition component
As final deliverable, an iOS-application will be made, which is able to propose questions to possibly injured elderly and give a proper response by making use of natural language processing.
Task division
The group has been divided into three seperate subgroups, which all independently focusses on different subjects, having their own tasks. This is needed to realize an integrated product of our final design at the end. Therefore, the group has been splitted up in such a way, that the subgroups will independently take care of the hardware, the software or the information page of our design.
- Software
- Bram
- Pieter
- Hardware
- Steef
- Man-Hing
- Information page
- Ken
- Everyone