Embedded Motion Control 2014 Group 1/Meeting 20140521

From Control Systems Technology Group
Revision as of 17:14, 11 June 2014 by S101840 (talk | contribs) (Created page with 'Meeting 6 date: 21-05-2014 Before the corridor challenge some small changes where made with respect to safety and the width of the corridor. During the corridor challenge Pico…')
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Meeting 6

date: 21-05-2014

Before the corridor challenge some small changes where made with respect to safety and the width of the corridor.

During the corridor challenge Pico was the fastest to finish the maze. Though we did not know about a speed limit for the robot. Therefore we became first of the groups that drove with a higher speed then the permitted one.