From Control Systems Technology Group
Jump to navigation
Jump to search
Group Members
Planning
Week:
|
Activities:
|
Feb 18 - Feb 24 |
|
Obtain robot specifications such as motor saturation (Frank - 4 hours). |
|
Design FRF measurement white noise injection and conduct the measurement (Rens / Jeroen - 6 hours). |
|
Make a selection of useful literature for the other group members (Jazz - 5 hours). |
|
Feb 25 - Mar 3 |
|
Design of kinematic model (not sure yet if needed) (Frank - 8 hours) |
|
Analyze FRF data (Rens / Jazz - 8 hours) |
|
Determine optimal algorithm: PID, LQG, H1, MPC or ILC (Jeroen - 4 hours) |
|
Mar 4 - Mar 10 |
|
Design controllers based on chosen algorithm for four axises separately (loop shaping) feedback and feedforward (All - 8 hours) |
|
Mar 11 - Mar 17 |
|
Test/tune designed controllers on the machine (Jazz / Rens - 5 hours) |
|
Design optimal trajectory (Jeroen / Frank - 8 hours) |
|
Mar 18 - Mar 24 |
|
Test optimal trajectory on the machine (Frank / Jeroen - 3 hours) |
|
Make presentation + solving unexpected problems (Rens / Jazz - 3 hours) |
|
Apr 1 - Apr 7 |
|
File:File.jpg
Progress
Week 1
- List of what you have done and learned
- ...
Week 2