0LAUK0 PRE2016 3 Groep10 Planning

From Control Systems Technology Group
Jump to navigation Jump to search

Planning

Gantt chart

See this link (our Google Sheet) for the latest version:

Gantt Chart Group10.jpg

Deadlines

  • Presentations
    • Presentation 1: February 13, 2017
    • Presentation 2: February 20, 2017
    • Presentation 3: April 03, 2017

Milestones

  • Literature study
  • Final design


Deliverables

  • CAD-model:
  • Speech recognition component:
  • Fall detecting component:

These components are integrated into one final deshich will be our physical final deliverable

Task division

The group has been divided into three seperate subgroups, which all independently focusses on different subjects, having their own tasks. This is needed to realize an integrated product of our final design at the end. Therefore, the group has been splitted up in such a way, that the subgroups will take care of the hardware, the software or the information page of our design.

  • Software
    • Bram
    • Pieter
  • Hardware
    • Steef
    • Man-Hing
  • Information page
    • Ken
    • Everyone

Others

Back to homepage