0LAUK0 2015 01 Week4

From Control Systems Technology Group
Revision as of 10:33, 21 September 2015 by S131047 (talk | contribs)
Jump to navigation Jump to search
Quick Links
Home
Content Plan Report Simulation
Log Week1 Week2 Week3 Week4 Week5 Week6 Week7

Week 4: 21-09-15

Meetings

Monday

To find measurable quantities Li will look into literature to find good waiting time quantities. The requirements should be better defined. Kasper, Lester and Eric S will work on the introduction and objectives part of the report. While they will do this they can easily also elaborate more on the requirements and explain why our system is an improvement on the current system. Frank and Li will start on the basic set up of the simulation so that we can start on it as soon as possible. The survey should also be done this week and Eric W and Joey will organize it and organize the data. Everyone will conduct some surveys to distribute the workload. There is still some work to do on the literature studies so we will still work on this.

Thursday

Plan

Progress

Kasper Bakker

Frank van Heeswijk

Yuanlong Li

Eric Steenhof

Joey Verest

Eric Wolters

Lester Jones