PRE2020 4 Group6
Jump to navigation
Jump to search
feel free to join if you still need a group
Members | Student ID | Faculty | |
---|---|---|---|
Marijn Borghouts | 1449532 | BMT | m.m.borghouts@student.tue.nl |
Bert de Groot | 1459597 | ME | g.d.groot@student.tue.nl |
Nando di Antonio | 1465325 | ME | n.z.d.antonio@student.tue.nl |
Dorien Duyndam | 1305107 | EE | d.a.duyndam@student.tue.nl |
Plan
Week 1
- Come up with an idea
- Make the planning
- Find relative papers
- Decide who the USErs will be
- Research about why it is good for the users
Week 2
- List the needs this user requires
- Research about possible components
- RPC list
Week 3
- Design an electrical circuit
- Make a start on the design of the pot
- Start working on the code
Week 4
- Start with the CAD design of the pot
- Continue working on the code
- Start testing the electrical components
Week 5
- Adjust the code according to the test results
- Test again
- Build a prototype
Week 6
- Upgrade the code again
- Adjust things to the prototype according to the test results
Week 7
- Work on the cstwiki
- Work on the design and start on the product
- Start working on the final presentation
Week 8
- Finalize the cstwiki
- Finalize the design and the product
- Finalize the final presentation
Deliverables
- The first deliverable will be this wiki page. It logs our progression and helps the tutors and other people with an interest in our project to follow the progression of the project.
- The second deliverable will be our physical prototype of the greenhouse climate management system.
- The third deliverable is the final presentation, in which we present our project for our teachers and peers.
Objectives
- 1: literature study
- 2: make an RPC list
- 3: make a BOM list
- 4: ordering of the parts
- 5: software development
- 6: making the prototype
- 7: make the final design
- 8: finalise the wiki page