Embedded Motion Control 2014 Group 8: Difference between revisions
Jump to navigation
Jump to search
Line 127: | Line 127: | ||
Unfortunately there was not enough time to implement the observations in the code. The second method is used and led to a time to pass the corridor in 32 seconds. | Unfortunately there was not enough time to implement the observations in the code. The second method is used and led to a time to pass the corridor in 32 seconds. | ||
=== second test === | === second test [21/05/2014] === | ||
In the second test the new safety driving, the new corner detection and the straight driving have been tested. The method to detect a corner was adjusted. Where earlier corners were detected with only one laser point, the new corner detection got a lift. They are detected via the subtraction of five laser points at the side and five laser points at the side a bit more backwards. Parameters such as the difference and the position of these laser points which are used are tuned within this meeting. <br> | In the second test the new safety driving, the new corner detection and the straight driving have been tested. The method to detect a corner was adjusted. Where earlier corners were detected with only one laser point, the new corner detection got a lift. They are detected via the subtraction of five laser points at the side and five laser points at the side a bit more backwards. Parameters such as the difference and the position of these laser points which are used are tuned within this meeting. <br> | ||
To get the exactly desired position where a corner should be detected, PICO is placed at the place where the corner should be detected. Two points that differ half a meter in distance are used as the points for measuring a corner. For robustness this is extended to the five closest measurement points.<br> | To get the exactly desired position where a corner should be detected, PICO is placed at the place where the corner should be detected. Two points that differ half a meter in distance are used as the points for measuring a corner. For robustness this is extended to the five closest measurement points.<br> |