Embedded Motion Control 2014 Group 1: Difference between revisions

From Control Systems Technology Group
Jump to navigation Jump to search
Line 59: Line 59:
* Setup SVN
* Setup SVN
* Plan a strategy for the corridor challenge
* Plan a strategy for the corridor challenge
=== Week 2 (2014-05-05 - 2014-05-09) ===
* Finishing tutorials
* Interpret laser sensor
* Positioning of PICO

Revision as of 13:35, 2 May 2014

Group Info

Name: Student id: Email:
Groupmembers (email all)
Sander Hoen 0609581 s.j.l.hoen@student.tue.nl
Marc Meijs 0761519 m.j.meijs@student.tue.nl
Wouter van Buul 0675642 w.b.v.buul@student.tue.nl
Richard Treuren 0714998 h.a.treuren@student.tue.nl
Joep van Putten 0588616 b.j.c.v.putten@student.tue.nl
Tutor
Sjoerd van den Dries n/a s.v.d.dries@tue.nl

Meetings

  1. Meeting - 2014-05-02

Planning

Week 1 (2014-04-25 - 2014-05-02)

  • Installing Ubuntu 12.04
  • Installing ROS
  • Following tutorials on C++ and ROS.
  • Setup SVN
  • Plan a strategy for the corridor challenge

Week 2 (2014-05-05 - 2014-05-09)

  • Finishing tutorials
  • Interpret laser sensor
  • Positioning of PICO