Group2 19-1 Week4: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 27: | Line 27: | ||
*Fiber optic cable at 100 K (Marco) | *Fiber optic cable at 100 K (Marco) | ||
*Communication options via fiber or alternative options (Kasper) | *Communication options via fiber or alternative options (Kasper) | ||
[[File:Water_Phase_Diagram.jpg|frame|right|Phase diagram of water]] | |||
[[PRE2019_1_Group2|Back to the main page]] | [[PRE2019_1_Group2|Back to the main page]] |
Revision as of 13:24, 24 September 2019
Notes tutor meeting
- Make requirements measurable
- Subdivide requirements
- Requirements, preferences and constraints
- Wie gaat het maken? Andere groep stakeholders/gebruikers
- Expand explanation for translation to exoplanets
- Nut van de achievements van de missie
- Wiki hoeft pas klaar te zijn na de presentatie, dus week 8
- Keuze voor experimenten moet echt gemaakt worden, deze week eigenlijk nog'
- Of we in een beschaving mogen/kunnen komen is een ethisch vraagstuk waar we wat meer op in moeten gaan
- Conclusies gaan trekken over constraints en keuzes
- Hoe zeker is er een oceaan op Europa, onze afweging moet duidelijk zijn voordat we ingaan op een cryobot sturen
- Planning weer updaten (week 5 report -> andere tijdsbesteding)
- Modelleren/berekenen
- Anthropologische deontologie
- Zekerheid oceaan
Voor donderdag:
- Requirements updaten (zie notes Tijn)(Wouter)
- Modelletje temperatuur (Wouter)
- Hoe omgaan met beschavingen (Wouter)
- Experimenten updaten (Marco)
- Planning updaten (Marco)
- Aanwezigheid oceaan bevestigen (Kasper)
- Fiber optic cable at 100 K (Marco)
- Communication options via fiber or alternative options (Kasper)