Embedded Motion Control 2017 Group 5 Meetings Overview: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 6: | Line 6: | ||
== Meeting 2 (16- | == Meeting 2 (16-05-2017) == | ||
Discussed initial design and prepared presentation. | Discussed initial design and prepared presentation. | ||
<li>Presentation will be made. | <li>Presentation will be made. | ||
Line 13: | Line 13: | ||
== Meeting 3 (19- | == Meeting 3 (19-05-2017) == | ||
Discussed corridor challenge progress. | Discussed corridor challenge progress. | ||
Line 19: | Line 19: | ||
<li>Think carefully on what we need/want to test (some parameters) Simulation vs Real. | <li>Think carefully on what we need/want to test (some parameters) Simulation vs Real. | ||
<li>Code the corridor challenge separately, in pairs Sjoerd & Bart (world model) , Rodrigo & Kagan (Motion Controller), Angel & Torben (Action Manager). | <li>Code the corridor challenge separately, in pairs Sjoerd & Bart (world model) , Rodrigo & Kagan (Motion Controller), Angel & Torben (Action Manager). | ||
== Meeting 4 (29-05-2017) == | |||
Define testing plan. | |||
<li>Tuesday, Turning 90° degrees with odometry, turn based on the laserdata, collect realtime data for worldmodel tests and tuning potential field (Angel, Sjoerd, Kagan, Bart) . | |||
<li>Wednesday, Everything not done on Tuesday, smoothing turnings, potential field with set point (Kagan, Rodrigo, Bart) | |||
<li>Use pythagoras, check for corner detection. | |||
== Meeting 5 (02-06-2017) == | |||
Discussed corridor challenge result and progress. | |||
<li>Things that go well (Potential field, detecting the gap and stopping in the right spot). | |||
<li>Things that didn't go well (Didn't stop after turning, due to time delays). | |||
<li>We are not using time delay anymore, we go back to odometry data. | |||
<li>First advance for Pledge algorithm (PICO got into a loop). | |||
<li>There's a problem while sticking to a wall when moving. | |||
== Meeting 6 (12-06-2017) == | |||
Discussed final presentation and maze challenge. | |||
<li>Tutor had no complaints about final presentation. | |||
<li>New function for align PICO and stay parallel to walls. | |||
<li>Integration of all functionalities tested, except for left and right doors (To test on tuesday). | |||
== Meeting 7 (20-06-2017) == | |||
Discuss the Wiki page. | |||
<li>Still mising some points. | |||
<li>Update functionality and system hierarchy. | |||
<li>Update IBD and add description. | |||
<li>Add figures and unused functions. | |||
<li>Merge corridor challenges explanations. |
Latest revision as of 17:28, 20 June 2017
Meeting 1 (12-5-2017)
Reviewed initial concept design with tutor.
Meeting 2 (16-05-2017)
Discussed initial design and prepared presentation.
Meeting 3 (19-05-2017)
Discussed corridor challenge progress.
Meeting 4 (29-05-2017)
Define testing plan.
Meeting 5 (02-06-2017)
Discussed corridor challenge result and progress.
Meeting 6 (12-06-2017)
Discussed final presentation and maze challenge.
Meeting 7 (20-06-2017)
Discuss the Wiki page.