Using our previous system identification findings, we proceeded to our controller synthesis procedure. The parametric models allowed us to nicely observe the step response of our plant(s), and thus determine various performance and stability margins for our controllers (like Gain Margin, Phase Margin, Modulus Margin, Bandwidth, Settling time, Rise Time and Overshoot). | Using our previous system identification findings, we proceeded to our controller synthesis procedure. The parametric models allowed us to nicely observe the step response of our plant(s), and thus determine various performance and stability margins for our controllers (like Gain Margin, Phase Margin, Modulus Margin, Bandwidth, Settling time, Rise Time and Overshoot). | ||
The main tools we used were the loopshaping tool Shapeit and the PID tuning tool of Matlab. The complexity of the controllers was kept low, since our plants were not extremely complicated (resembled the expected double integrator transfer function quite substantially). | The main tools we used were the loopshaping tool Shapeit and the PID tuning tool of Matlab. The complexity of the controllers was kept low, since our plants were not extremely complicated (resembled the expected double integrator transfer function quite substantially). | ||
| - | |- | ||
| - | |- | ||
[[File:shapeit1.jpg]] | [[File:shapeit1.jpg]] | ||
Revision as of 16:45, 27 March 2013
Group Members
Name: | Student id: | Email: |
Joep Alleleijn | 0760626 | j.h.h.m.alleleijn@student.tue.nl |
E. Romero Sahagun | 0827538 | e.romero.sahagun@student.tue.nl |
M. Kabacinski | 0789360 | m.j.kabacinski@student.tue.nl |
N. Kontaras | 0827208 | n.kontaras@student.tue.nl |
A. Simon | 0676675 | a.s.simon@student.tue.nl |
Planning
Week: | Activities: | |
---|---|---|
Feb 18 - Feb 24 | ||
- Make a list for the requirements of the controller | ||
- Prepare and conduct tests for coupling/decoupling(JA,NK,MK) 3.5 hours | ||
- Prepare and conduct tests for non linearity (JA,NK,MK) 3.5 hours | ||
- Prepare and conduct tests for joint identification and create FRF models of the joints (JA,NK,MK) 5 hours | ||
- Set up DH transfer matrices (AS) 5 hours | ||
- Generate Matlab Simulation of the kinematic chain (ER) 7 Hours | ||
Feb 25 - Mar 3 | ||
- Finish tests for moving direction and create FRF models of the moving direction, moving direction is (JA,NK,MK) 5 hours | ||
- Design PID feedback controller, add feedforward and test on the robot for each axis of freedom (JA,NK,MK) 11 hours | ||
- Prepare testing procedure, for following of the trajectory and checking of the requirements (JA,NK,MK) 1.5 hours | ||
- Matlab code for trajectory generation (TG) (ER) 5 hours | ||
Mar 4 - Mar 11 | ||
- Test controllers on the robot (JA,NK,MK) 2 hours | ||
- Test trajectory generation on the simulation (ER) 3 hours | ||
- Integrate Inverse Kinematics with Controllers (AS,ER) 2 hours | ||
Mar 12 - Mar 19 | ||
- Consider different controller design methods (JA,NK,MK,AS,ER) 10 hours | ||
- Work on report (JA,NK,MK,AS,ER) 2 hours | ||
Mar 20 - Mar 27 | ||
- Test routine generation on the robot (JA,NK,MK,AS,ER) 2 hours | ||
- Select optimal routine (JA,NK,MK,AS,ER) 4 hours | ||
- Problem solving (JA,NK,MK,AS,ER) 10 hours | ||
- Consider different controller design methods (JA,NK,MK,AS,ER) 10 hours | ||
- Test different controllers (JA,NK,MK,AS,ER) 5 hours | ||
- Work on report (JA,NK,MK,AS,ER) 2 hours | ||
Mar 28 - Apr 4 | ||
- Work on report (JA,NK,MK,AS,ER) 15 hours | ||
- Prepare presentation (JA,NK,MK,AS,ER) 5 hours |
Progress
Week 1: Feb 18 - Feb 24
1 Make a list of the requirements and design assumptions for the controller | ||
Controller requirements: | ||
- Each of the four inputs of the robot is required to follow the third order trajectory, thereby the resulting trajectory of the fork will be appropriate to safely move the three pizzas form there initial positions to the final positions. | ||
- The error between the reference trajectory and the actual trajectory of the fork has to be smaller then 0.5 cm during the whole time of operation. | ||
- The settling time of the controller needs to be less 0.5 seconds. | ||
- The acceleration applied to the platform has to be as high as possible without a pizza falling of the platform while following the trajectory. | ||
- The total time of transport of the three pizzas should be less 15 seconds.
| ||
Design assumptions: | ||
- Position will be used as input reference for the pizza robot. The pizza robot provides its position as output, this information can be used to compare to the desired position in closed loop control. | ||
- The controller works with the sampling frequency of 500 Hz, because the sampling frequency of the system is 500 Hz. | ||
- FRF will be used to obtain a model of the system. This method can be used to obtain a model of a system without knowing all the parameters of the system. | ||
- Initially a PID controller will be used to follow the setpoint trajectory. A PID controller will be used because it is a simple controller and every team member is familiar with the concept. To increase performance this PID controller can be extended with feedforward block. When this controller functions according to the set requirements, different control methods will be explored to investigate if it would be possible to increase performance.
| ||
2 Prepare and conduct tests for coupling/decoupling (JA,NK,MK) | ||
Have not done yet, task is postponed to the next week. However so far we have not encountered problems with decoupling. It seems that the complete system can be approached as several SISO systems. This makes it possible to use decoupled (diagonal) controller. More detailed test are to be carried out next week.
| ||
3 Prepare and conduct tests for non linearity (JA,NK,MK) | ||
Have not done yet, task is postponed to the next week.
| ||
4 Prepare and conduct tests for joint identification and create FRF models of the direction of motion (JA,NK,MK) | ||
Started with FRF measurements, takes longer then expected. Especially for the vertical movement it is challenge to conduct a measurement without hitting the airbag limits of the machine.
Most recent FRF models of the vertival fork displacement: | ||
5 Set up DH transfer matrices (AS) | ||
Inverse kinematics do not have to be determined, this has been already done, only trajectory and controllers have to be developed.
| ||
6 Generate Matlab Simulation of the kinematic chain (ER) | ||
Kinematic chain is already provided.
| ||
7 Trajectory and Path Generation (AS,ER) | ||
LSBP (Linear Segments with Parabolic Blends) and Quintic polynomial trajectory functions have been programmed, as well as a generic script for path generation using these functions. The functions allow to create the fastest trajectory between two points based on acceleration restrictions.
|
Week 2: Feb 25 - Mar 3
1 Make a list for the requirements of the controller |
Controller requirements: |
- Position will be used as input reference for the pizza robot. The pizza robot provides its position as output, this information can be used to compare to the desired position in closed loop control. |
- Each of the four inputs of the robot is required to follow the third order trajectory, thereby the resulting trajectory of the fork will be appropriate to safely move the three pizzas form there initial positions to the final positions. |
For the controllers the following margins will be applied: |
- Phase margin: >45 degrees |
- Gain margin: >6dB |
- Modulus margin: <6dB
|
Rotation axis: |
- The error between the reference trajectory for the rotation and the actual trajectory for the rotation of the robot has to be smaller then 0.25 degree. |
- The amount of overshoot should be less than 5%. |
- Bandwidth of the system (plant + control) should be high enough to minimize the non-linear friction static error, but low enough in order to not amplify noise. A bandwidth of between 5Hz and 10Hz seems appropriate. |
- The rotation of the robot from one rack to the other rack should take less then 1.5 seconds. |
Vertical axis: |
- The error between the reference trajectory for the vertical movement and the actual trajectory for the vertical movement of the fork has to be smaller then 0.5 cm. |
- The amount of overshoot should be less than 5%. |
- Bandwidth of the system (plant + control) should be high enough to minimize the non-linear friction static error, but low enough in order to not amplify noise. A bandwidth of between 5Hz and 10Hz seems appropriate. |
Horizontal axis: |
- The error between the reference trajectory for the horizontal movement and the actual trajectory for the horizontal movement of the fork has to be smaller then 2 cm. |
- The amount of overshoot should be less than 5%. |
- Bandwidth of the system (plant + control) should be high enough to minimize the non-linear friction static error, but low enough in order to not amplify noise. A bandwidth of between 5Hz and 10Hz seems appropriate. |
Translation axis: |
- The error between the reference trajectory for the translation of the platform and the actual trajectory for the translation of the robot has to be smaller then 1 cm. |
- The amount of overshoot should be less than 5%. |
- Bandwidth of the controller should be high enough to minimize the non-linear friction static error, but low enough in order to not amplify noise. A bandwidth of between 5Hz and 10Hz seems appropriate.
|
- The controller works with the sample frequency of 500 Hz, the sampling frequency of the system is 500 Hz. |
- The acceleration exerted on to the platform has to be as high as possible without a pizza falling of the platform while following the trajectory. |
- The total time of transport of the three pizza's should be less 15 seconds. |
- FRF will be used to obtain a model of the system. This method can be used to obtain a model of a system without knowing all the parameters of the system. |
- The acceleration of the reference trajectories should be at least second order or higher to reduce the amount of overshoot |
Assumptions: |
- Initially a PID controller will be used to follow the set trajectory. A PID controller will be used because it is a simple controller and every team member is familiar with the concept. To increase performance this PID controller can be extended with feedforward. When this controller functions according to the set requirements, different control methods will be explored to investigate if it would be possible to increase performance.
|
2 Set up DH transfer matrices (AS) 5 hours |
- Not necessary, already provided.
|
3 Generate Matlab Simulation of the kinematic chain (ER) 7 Hours |
- Not necessary, already provided.
|