Integration Project Systems and Control 2013 Group 2: Difference between revisions
Jump to navigation
Jump to search
Line 8: | Line 8: | ||
<tr> | <tr> | ||
<td>Rens Samplonius</td> | <td>Rens Samplonius</td> | ||
<td> | <td>0785119</td> | ||
<td>[mailto:r.j.samplonius@student.tue.nl r.j.samplonius@student.tue.nl]</td> | <td>[mailto:r.j.samplonius@student.tue.nl r.j.samplonius@student.tue.nl]</td> | ||
</tr> | </tr> | ||
<tr> | <tr> | ||
<td>Frank Evers</td> | <td>Frank Evers</td> | ||
<td> | <td>0789890</td> | ||
<td>[mailto:f.evers@student.tue.nl f.evers@student.tue.nl]</td> | <td>[mailto:f.evers@student.tue.nl f.evers@student.tue.nl]</td> | ||
</tr> | </tr> | ||
<tr> | <tr> | ||
<td>Juan Guo</td> | <td>Juan Guo</td> | ||
<td> | <td>0825223</td> | ||
<td>[mailto:j.guo@student.tue.nl j.guo@student.tue.nl]</td> | <td>[mailto:j.guo@student.tue.nl j.guo@student.tue.nl]</td> | ||
</tr> | </tr> | ||
<tr> | <tr> | ||
<td>Jeroen Lamers</td> | <td>Jeroen Lamers</td> | ||
<td> | <td>0771264</td> | ||
<td>[mailto:j.w.lamers@student.tue.nl j.w.lamers@student.tue.nl]</td> | <td>[mailto:j.w.lamers@student.tue.nl j.w.lamers@student.tue.nl]</td> | ||
</tr> | </tr> |
Revision as of 09:52, 25 February 2013
Group Members
Name: | Student id: | Email: |
Rens Samplonius | 0785119 | r.j.samplonius@student.tue.nl |
Frank Evers | 0789890 | f.evers@student.tue.nl |
Juan Guo | 0825223 | j.guo@student.tue.nl |
Jeroen Lamers | 0771264 | j.w.lamers@student.tue.nl |
Planning
Week: | Activities: |
---|---|
Feb 18 - Feb 24 | |
Obtain robot specifications such as motor saturation (Frank - 4 hours). | |
Design FRF measurement white noise injection and conduct the measurement (Rens / Jeroen - 6 hours). | |
Make a selection of useful literature for the other group members (Jazz - 5 hours). | |
Feb 25 - Mar 3 | |
Design of kinematic model (not sure yet if needed) (Frank - 8 hours) | |
Analyze FRF data (Rens / Jazz - 8 hours) | |
Determine optimal algorithm: PID, LQG, H1, MPC or ILC (Jeroen - 4 hours) | |
Mar 4 - Mar 10 | |
Design controllers based on chosen algorithm for four axises separately (loop shaping) feedback and feedforward (All - 8 hours) | |
Mar 11 - Mar 17 | |
Test/tune designed controllers on the machine (Jazz / Rens - 5 hours) | |
Design optimal trajectory (Jeroen / Frank - 8 hours) | |
Mar 18 - Mar 24 | |
Test optimal trajectory on the machine (Frank / Jeroen - 3 hours) | |
Make presentation + solving unexpected problems (Rens / Jazz - 3 hours) | |
Apr 1 - Apr 7 |
Progress
Week 1
- List of what you have done and learned
- ...
Week 2
- ...