|Feb 18 - Feb 24||
|Feb 18 - Feb 24||
|-
|-
|Obtain robot specifications such as motor saturation (Frank)(4 hours).||
|Obtain robot specifications such as motor saturation (Frank - 4 hours).||
|-
|Rens / Jeroen Design FRF measurement white noise injection and conduct the measurement 6 hours 2x.||
|-
|Jazz Make a selection of useful literature for the other group members 5 hours.||
|-
|-
|Feb 25 - Mar 3 ||
|Feb 25 - Mar 3 ||
|-
|Frank Design of kinematic model (not sure yet if needed) 8 hours||
|-
|Rens / Jazz Analyze FRF data 8 hours 2x||
|-
|Jeroen Determine optimal algorithm: PID, LQG, H1, MPC or ILC 4 hours||
|-
|-
|Mar 4  - Mar 10||
|Mar 4  - Mar 10||
|-
|All Design controllers based on chosen algorithm for four axises separately (loop shaping) feedback and feedforward 8 hours 4x||
|-
|-
|Mar 11 - Mar 17||
|Mar 11 - Mar 17||
|-
|Jazz / Rens Test/tune designed controllers on the machine 5 hours 2x||
|-
|
Jeroen / Frank Design optimal trajectory 8 hours 2x||
|-
|-
|Mar 18 - Mar 24||
|Mar 18 - Mar 24||
|-
|Frank / Jeroen Test optimal trajectory on the machine 3 hours 2x||
|-
|Rens / Jazz Make presentation + solving unexpected problems 3 hours 2x||
|-
|-
|Apr 1  - Apr 7 ||
|Apr 1  - Apr 7 ||

Revision as of 16:18, 18 February 2013

Group Members

Name: Student id: Email:
Rens Samplonius please fill in r.j.samplonius@student.tue.nl
Frank Evers please fill in f.evers@student.tue.nl
Juan Guo please fill in j.guo@student.tue.nl
Jeroen Lamers please fill in j.w.lamers@student.tue.nl

Planning

Week: Activities:
Feb 18 - Feb 24
Obtain robot specifications such as motor saturation (Frank - 4 hours).
Rens / Jeroen Design FRF measurement white noise injection and conduct the measurement 6 hours 2x.
Jazz Make a selection of useful literature for the other group members 5 hours.
Feb 25 - Mar 3
Frank Design of kinematic model (not sure yet if needed) 8 hours
Rens / Jazz Analyze FRF data 8 hours 2x
Jeroen Determine optimal algorithm: PID, LQG, H1, MPC or ILC 4 hours
Mar 4 - Mar 10
All Design controllers based on chosen algorithm for four axises separately (loop shaping) feedback and feedforward 8 hours 4x
Mar 11 - Mar 17
Jazz / Rens Test/tune designed controllers on the machine 5 hours 2x

Jeroen / Frank Design optimal trajectory 8 hours 2x||

Mar 18 - Mar 24
Frank / Jeroen Test optimal trajectory on the machine 3 hours 2x
Rens / Jazz Make presentation + solving unexpected problems 3 hours 2x
Apr 1 - Apr 7

Progress

Week 1

  • List of what you have done and learned
  • ...

Week 2

  • ...