0LAUK0 PRE2016 3 Groep10 Planning: Difference between revisions

From Control Systems Technology Group
Jump to navigation Jump to search
No edit summary
Line 27: Line 27:
* Final design (resp.)
* Final design (resp.)
** Description (with i.e. preliminary model)
** Description (with i.e. preliminary model)
** Ordered components received
** CAD-model
** Electrical fall detection component
** Speech recognition (A.I.)
** Speech recognition (A.I.)
** Completed final design
** Completed final design

Revision as of 14:50, 23 March 2017

Planning

Gantt chart

Gantt Chart Group10.jpg

Deadlines

  • Presentations
    • Presentation 1: February 13, 2017
    • Presentation 2: February 20, 2017
    • Presentation 3: April 03, 2017
  • End-term evaluation (peer-review): TBA
  • Finalize final design: April 03, 2017
  • Finalize Wiki-page: April 03, 2017

The stated deadlines will all be graded.

Milestones

  • Literature study (resp.)
    • USE-aspects
    • Research
    • Technical information
    • Completed Wiki-page
  • Final design (resp.)
    • Description (with i.e. preliminary model)
    • Speech recognition (A.I.)
    • Completed final design

Deliverables

  • CAD-model
  • Speech recognition component
  • Fall detecting component

These components are integrated into one final design, which will be our physical final deliverable.

Task division

The group has been divided into three seperate subgroups, which all independently focusses on different subjects, having their own tasks. This is needed to realize an integrated product of our final design at the end. Therefore, the group has been splitted up in such a way, that the subgroups will independently take care of the hardware, the software or the information page of our design.

  • Software
    • Bram
    • Pieter
  • Hardware
    • Steef
    • Man-Hing
  • Information page
    • Ken
    • Everyone

Others

Back to homepage