0LAUK0 PRE2016 3 Groep10 Planning: Difference between revisions
Jump to navigation
Jump to search
Line 22: | Line 22: | ||
== Milestones == | == Milestones == | ||
* Literature study | * Literature study | ||
** USE-aspects | |||
** Research | |||
** Technical information | |||
** Completed Wiki-page | |||
(resp.) | |||
* Final design | * Final design | ||
** Description (with i.e. preliminary model) | |||
** Ordered components received | |||
** CAD-model | |||
** Electrical fall detection component | |||
** Speech recognition (A.I.) | |||
** Completed final design | |||
(resp.) | |||
== Deliverables == | == Deliverables == |
Revision as of 01:23, 6 March 2017
Planning
Gantt chart
See this link (our Google Sheet) for the latest version:
Deadlines
- Presentations
- Presentation 1: February 13, 2017
- Presentation 2: February 20, 2017
- Presentation 3: April 03, 2017
- End-term evaluation (peer-review): TBA
- Finalize final design: April 03, 2017
- Finalize Wiki-page: April 03, 2017
The stated deadlines will all be graded.
Milestones
- Literature study
- USE-aspects
- Research
- Technical information
- Completed Wiki-page
(resp.)
- Final design
- Description (with i.e. preliminary model)
- Ordered components received
- CAD-model
- Electrical fall detection component
- Speech recognition (A.I.)
- Completed final design
(resp.)
Deliverables
- CAD-model
- Speech recognition component
- Fall detecting component
These components are integrated into one final design, which will be our physical final deliverable.
Task division
The group has been divided into three seperate subgroups, which all independently focusses on different subjects, having their own tasks. This is needed to realize an integrated product of our final design at the end. Therefore, the group has been splitted up in such a way, that the subgroups will independently take care of the hardware, the software or the information page of our design.
- Software
- Bram
- Pieter
- Hardware
- Steef
- Man-Hing
- Information page
- Ken
- Everyone