0LAUK0 PRE2016 3 Groep10 Planning: Difference between revisions

From Control Systems Technology Group
Jump to navigation Jump to search
Line 16: Line 16:


== Deliverables ==
== Deliverables ==
** CAD-model:  
* CAD-model:  
** Speech recognition component:  
* Speech recognition component:  
** Fall detecting component:
* Fall detecting component:


These components are integrated into one final deshich will be our physical final deliverable
These components are integrated into one final deshich will be our physical final deliverable

Revision as of 14:23, 23 February 2017

Planning

Gantt chart

Gantt Chart Group10.jpg

Deadlines

  • Presentations
    • Presentation 1: February 13, 2017
    • Presentation 2: February 20, 2017
    • Presentation 3: April 03, 2017

Milestones

  • Literature study
  • Final design


Deliverables

  • CAD-model:
  • Speech recognition component:
  • Fall detecting component:

These components are integrated into one final deshich will be our physical final deliverable

Task division

Others

Back to homepage