== Group Members ==
Gijs Herings        0953862
Martijn de Boer      0907480
Max van Meer        0951669
Bart Tulkens        0956335
Martin van Leeuwen  0901497
Josja Geijsberts    0896965
== Introduction ==
== Introduction ==



Revision as of 12:32, 12 February 2017

Group Members

Gijs Herings 0953862 Martijn de Boer 0907480 Max van Meer 0951669 Bart Tulkens 0956335 Martin van Leeuwen 0901497 Josja Geijsberts 0896965

Introduction

Requirements, Preferences & Constraints

Requirements

  • Grabbing and releasing Duplo® building blocks
  • Stacking the building blocks to construct a building
  • Autonomously carrying out a set building plan

Preferences

  • On-site setup of the robot is easy and fast
  • The construction built is as robust as possible
  • Bystanders’ safety is ensured
  • The robot is as cheap as possible

Constraints

  • Placement precision has to be in the order of 10^-4 m
  • The robot has to be able to reach the top of the building
  • The budget depends on dr. Molengraft’s level of interest