Log: Difference between revisions

From Control Systems Technology Group
Jump to navigation Jump to search
No edit summary
No edit summary
Line 17: Line 17:
|3 hours
|3 hours
|-
|-
|05-12-2015
|Simon  
|Simon  
|Analysing the texts from  [Liu B Chen P Wang G], [Qi G Song P Li K] and [Nicolis S Detrain C Demolin D Deneubourg J] to compose a swarm algorithm for the top level simulation
|Analysing the texts from  [Liu B Chen P Wang G], [Qi G Song P Li K] and [Nicolis S Detrain C Demolin D Deneubourg J] to compose a swarm algorithm for the top level simulation
|3 hours
|3 hours
|}
|}

Revision as of 12:31, 5 December 2015

Back to: PRE2015_2_Groep1

Date: Student(s): Task: Hours spend:
30-11-2015 Jesse, Alex, Simon and Guus Making a specific planning for the rest of the case and tried to find Harry van de Loo in order to ask about the availability of the mindstorm robots. 2 hours each (=8 hours total)
30-11-2015 Simon Working on the first simulation (top level) 3 hours
05-12-2015 Simon Analysing the texts from [Liu B Chen P Wang G], [Qi G Song P Li K] and [Nicolis S Detrain C Demolin D Deneubourg J] to compose a swarm algorithm for the top level simulation 3 hours