0LAUK0 2015 01 Week4: Difference between revisions

From Control Systems Technology Group
Jump to navigation Jump to search
No edit summary
No edit summary
Line 40: Line 40:
== Progress from Frank van Heeswijk ==
== Progress from Frank van Heeswijk ==


== Progress from Yuanlong Li==
== Progress from Yuanlong Li ==


== Progress from Eric Steenhof=
== Progress from Eric Steenhof =


== Progress from Joey Verest==
== Progress from Joey Verest ==


== Progress from Eric Wolters ==
== Progress from Eric Wolters ==


== Progress from Lester Jones==
== Progress from Lester Jones ==

Revision as of 10:31, 21 September 2015

Quick Links
Home
Content Plan Report Simulation
Log Week1 Week2 Week3 Week4 Week5 Week6 Week7

Week 4: 21-09-15

Meetings Monday

To find measurable quantities Li will look into literature to find good waiting time quantities. The requirements should be better defined. Kasper, Lester and Eric S will work on the introduction and objectives part of the report. While they will do this they can easily also elaborate more on the requirements and explain why our system is an improvement on the current system. Frank and Li will start on the basic set up of the simulation so that we can start on it as soon as possible. The survey should also be done this week and Eric W and Joey will organize it and organize the data. Everyone will conduct some surveys to distribute the workload. There is still some work to do on the literature studies so we will still work on this.


Plan

Progress from Kasper Bakker

Progress from Frank van Heeswijk

Progress from Yuanlong Li

= Progress from Eric Steenhof

Progress from Joey Verest

Progress from Eric Wolters

Progress from Lester Jones