PRE2015 1 Groep1: Difference between revisions
Line 9: | Line 9: | ||
== Objectives == | == Objectives == | ||
Make a design of autonomous bus scheduling system. | |||
---Schedule | ---Schedule | ||
Line 19: | Line 19: | ||
---Network between busses | ---Network between busses | ||
Make a simulation of the system to optimize "passenger happiness" | |||
---Less wait time | ---Less wait time | ||
Line 29: | Line 29: | ||
---More facts from survey feedback | ---More facts from survey feedback | ||
Make a report | |||
---Survey Result | ---Survey Result |
Revision as of 08:41, 17 September 2015
Autonomous Bus Scheduling System
Introduction
This project is intended to deliver a design report of autonomous bus scheduling system. The system is aimed to create an efficient passenger flow. It will be able to send extra busses to bus stops that are or are getting too crowded and also the system will choose a shorter route to it’s destination when no passengers are waiting at the coming bus stops. Users can check in at the bus stop or with their mobile phone apps. The scheduling system will then optimize the routes by taking this information into account.
Background Study
to be done...
Objectives
Make a design of autonomous bus scheduling system.
---Schedule
---Routing of the bus
---Low traveling and waiting times
---Network between busses
Make a simulation of the system to optimize "passenger happiness"
---Less wait time
---Less traveling time
---Less crowdedness
---More facts from survey feedback
Make a report
---Survey Result
---Literature studies
---Simulation results
Approaches
Content
Design Report
Simulation
-Environment Setup
-Test Cases
Presentation
-Second Presentation
-Final Presentation
Working Log
-Week 2
-Week 3
-Week 4
-Week 5
-Week 6
-Week 7
Team
0856925 Kasper Bakker
0772418 Frank van Heeswijk
0853336 Yuanlong Li
0856593 Eric Steenhof
0844791 Joey Verest
0859523 Eric Wolters