Embedded Motion Control 2012 Group 6: Difference between revisions

From Control Systems Technology Group
Jump to navigation Jump to search
Line 10: Line 10:
** Installed ROS + Eclipse (all)
** Installed ROS + Eclipse (all)
** Installed Ubuntu (all)
** Installed Ubuntu (all)
* '''Week 2'''
** Finished with tutorials (all)
** Practiced with simulator (all)
** Investigated sensor data(all)

Revision as of 13:58, 9 May 2012

ToDo

List of planned items.

  • Finish tutorials (Week 2)
  • Study information about sensors of the Jazz robot (Week 2)

Progress

Progress of the group. The newest item is listed on top.

  • Week 1
    • Started with tutorials (all)
    • Installed ROS + Eclipse (all)
    • Installed Ubuntu (all)
  • Week 2
    • Finished with tutorials (all)
    • Practiced with simulator (all)
    • Investigated sensor data(all)