Embedded Motion Control 2012 Group 6: Difference between revisions

From Control Systems Technology Group
Jump to navigation Jump to search
Line 2: Line 2:
List of planned items.
List of planned items.
* Finish tutorials (Week 2)
* Finish tutorials (Week 2)
* Study information about sensors of the Jazz robot
* Study information about sensors of the Jazz robot (Week 2)


==Progress==
==Progress==

Revision as of 13:05, 2 May 2012

ToDo

List of planned items.

  • Finish tutorials (Week 2)
  • Study information about sensors of the Jazz robot (Week 2)

Progress

Progress of the group. The newest item is listed on top.

  • Week 1
    • Started with tutorials (all)
    • Installed ROS + Eclipse (all)
    • Installed Ubuntu (all)