Embedded Motion Control 2012 Group 6: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
Line 1: | Line 1: | ||
==ToDo== | |||
List of planned items. | |||
* Finish tutorials (Week 2) | |||
* Study information about sensors of the Jazz robot | |||
==Progress== | ==Progress== | ||
Progress of the group. The newest item is listed on top. | Progress of the group. The newest item is listed on top. |
Revision as of 13:04, 2 May 2012
ToDo
List of planned items.
- Finish tutorials (Week 2)
- Study information about sensors of the Jazz robot
Progress
Progress of the group. The newest item is listed on top.
- Week 1
- Started with tutorials (all)
- Installed ROS + Eclipse (all)
- Installed Ubuntu (all)