Log: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 56: | Line 56: | ||
|Worked on robot plus sofware involving the robots, only to find out that the robot i took home was defect. Also wrote the page about [[Windows emulator]]. | |Worked on robot plus sofware involving the robots, only to find out that the robot i took home was defect. Also wrote the page about [[Windows emulator]]. | ||
|5 hours | |5 hours | ||
|- | |||
|09-12-2015 | |||
|Jesse, Alex | |||
|Meeting with Mrs. Barakova and acquiring of the new NXT models. | |||
|1 hour each (= 2 hours total) | |||
|- | |||
|10-12-2015 | |||
|Jesse, Guus, Chris, Alex | |||
|Building the new robots | |||
|4 hours each (= 16 hours total) | |||
|} | |} |
Revision as of 14:28, 13 December 2015
Back to: PRE2015_2_Groep1
Date: | Student(s): | Task: | Hours spend: |
30-11-2015 | Jesse, Alex, Simon and Guus | Making a specific planning for the rest of the case and tried to find Harry van de Loo in order to ask about the availability of the mindstorm robots. | 2 hours each (=8 hours total) |
30-11-2015 | Simon | Working on the first simulation (top level) | 3 hours |
31-12-2015 | Chris | Working on simulation | 3 hours |
03-12-2015 | Chris | Working on simulation and literature research | 4 hours |
04-12-2015 | Jesse, Alex, Guus | Aquiring of the robot parts and the assembly of the robot swarm | 5 hours each (=15 hours total) |
05-12-2015 | Simon | Analysing the texts from [Liu B Chen P Wang G], [Qi G Song P Li K] and [Nicolis S Detrain C Demolin D Deneubourg J] to compose a swarm algorithm for the top level simulation. Also work on the simulation itself. | 3 hours |
06-12-2015 | Jesse | Finding out how the RCX 2.0 bricks can be programmed and write a first script to run on for the Lego Mindstorms Robots | 4 hours |
06-12-2015 | Simon | Working on the top level simulation | 8 hours |
06-12-2015 | Alex | Researching and describing the communication possibilities of the robots | 5 hours |
06-12-2015 | Guus | Worked on robot plus sofware involving the robots, only to find out that the robot i took home was defect. Also wrote the page about Windows emulator. | 5 hours |
09-12-2015 | Jesse, Alex | Meeting with Mrs. Barakova and acquiring of the new NXT models. | 1 hour each (= 2 hours total) |
10-12-2015 | Jesse, Guus, Chris, Alex | Building the new robots | 4 hours each (= 16 hours total) |