Revision as of 09:11, 7 December 2015

Back to: PRE2015_2_Groep1

Date: Student(s): Task: Hours spend:
30-11-2015 Jesse, Alex, Simon and Guus Making a specific planning for the rest of the case and tried to find Harry van de Loo in order to ask about the availability of the mindstorm robots. 2 hours each (=8 hours total)
30-11-2015 Simon Working on the first simulation (top level) 3 hours
31-12-2015 Chris Working on simulation 3 hours
03-12-2015 Chris Working on simulation and literature research 4 hours
04-12-2015 Jesse, Alex, Guus Aquiring of the robot parts and the assembly of the robot swarm 5 hours each (=15 hours total)
05-12-2015 Simon Analysing the texts from [Liu B Chen P Wang G], [Qi G Song P Li K] and [Nicolis S Detrain C Demolin D Deneubourg J] to compose a swarm algorithm for the top level simulation. Also work on the simulation itself. 3 hours
06-12-2015 Jesse Finding out how the RCX 2.0 bricks can be programmed and write a first script to run on for the Lego Mindstorms Robots 4 hours
06-12-2015 Simon Working on the top level simulation 8 hours
06-12-2015 Alex Researching and describing the communication possibilities of the robots 5 hours
06-12-2015 Guus Worked on robot plus sofware involving the robots, only to find out that the robot i took home was defect. Also wrote the page about Windows emulator. 5 hours