Embedded Motion Control 2014 Group 1/Meeting 20140514: Difference between revisions

From Control Systems Technology Group
Jump to navigation Jump to search
S101840 (talk | contribs)
No edit summary
S101840 (talk | contribs)
No edit summary
 
Line 1: Line 1:
Meeting 2
Meeting 3


date: 14-05-2014 (16.00-17.00)
date: 14-05-2014 (16.00-17.00)


The maze file is up and running. Some fine tuning needs to be done. Thursday evening tests will be done with pico.
The maze file is up and running. Some fine tuning needs to be done. Thursday evening tests will be done with pico.

Latest revision as of 17:57, 11 June 2014

Meeting 3

date: 14-05-2014 (16.00-17.00)

The maze file is up and running. Some fine tuning needs to be done. Thursday evening tests will be done with pico.