0LAUK0 PRE2016 3 Groep10 Planning: Difference between revisions
(7 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
= Planning = | = Planning = | ||
== Gantt chart == | == Gantt chart == | ||
[[File:Gantt_Chart_Group10.jpg | 1340 px]] | [[File:Gantt_Chart_Group10.jpg | 1340 px]] | ||
Line 12: | Line 10: | ||
** Presentation 3: '''April 03, 2017''' | ** Presentation 3: '''April 03, 2017''' | ||
* End-term evaluation (peer-review): ''' | * End-term evaluation (peer-review): '''April 03, 2017''' | ||
* Finalize final design: '''April 03, 2017''' | * Finalize final design: '''April 03, 2017''' | ||
* Finalize Wiki-page: '''April | * Finalize Wiki-page: '''April 13, 2017''' | ||
The stated deadlines will all be graded. | The stated deadlines will all be graded. | ||
Line 29: | Line 27: | ||
* Final design (resp.) | * Final design (resp.) | ||
** Description (with i.e. preliminary model) | ** Description (with i.e. preliminary model) | ||
** Speech recognition (A.I.) | ** Speech recognition (A.I.) | ||
** Completed final design | ** Completed final design | ||
== Deliverables == | == Deliverables == | ||
* | * iOS-application (interface) | ||
* Speech recognition component | * Speech recognition component | ||
As final deliverable, an iOS-application will be made, which is able to propose questions to possibly injured elderly and give a proper response by making use of natural language processing. | |||
== Task division == | == Task division == | ||
The group | The group was initially divided into three seperate subgroups, which all independently focusses on different subjects, having their own tasks. This is needed to realize an integrated product of the final design at the end. Therefore, the group has been splitted up in such a way, that the subgroups will independently take care of the hardware, the software or the information page of our design. | ||
* | *Software | ||
** Bram | ** Bram | ||
** Pieter | ** Pieter | ||
* | *Hardware | ||
** Steef | ** Steef | ||
** Man-Hing | ** Man-Hing | ||
* | *Information page | ||
** Ken | ** Ken | ||
** Everyone | ** Everyone | ||
Later on, after changing the general project planning and deliverables, the group has been split up differently. Only one member will be responsible for the development of the application prototype, and the others are going to focus on the literature. The subjects what each member individually has to focus on each week, will be assigned during the group meetings. These subtasks are described in [http://cstwiki.wtb.tue.nl/index.php?title=0LAUK0_PRE2016_3_Groep10_Project_progress Appendix A]. | |||
The group has now been split up as follows: | |||
*Application development | |||
** Pieter | |||
Pieter will be responsible for this task, because he already has experience with development of applications, since he is creating iOS-applications for his job. | |||
*Literature | |||
** Ken | |||
** Steef | |||
** Man-Hing | |||
** Lennard | |||
** Bram | |||
== Others == | == Others == | ||
[http://cstwiki.wtb.tue.nl/index.php?title=PRE2016_3_Groep10#Idea Back to homepage] | [http://cstwiki.wtb.tue.nl/index.php?title=PRE2016_3_Groep10#Idea Back to homepage] |
Latest revision as of 15:38, 13 April 2017
Planning
Gantt chart
Deadlines
- Presentations
- Presentation 1: February 13, 2017
- Presentation 2: February 20, 2017
- Presentation 3: April 03, 2017
- End-term evaluation (peer-review): April 03, 2017
- Finalize final design: April 03, 2017
- Finalize Wiki-page: April 13, 2017
The stated deadlines will all be graded.
Milestones
- Literature study (resp.)
- USE-aspects
- Research
- Technical information
- Completed Wiki-page
- Final design (resp.)
- Description (with i.e. preliminary model)
- Speech recognition (A.I.)
- Completed final design
Deliverables
- iOS-application (interface)
- Speech recognition component
As final deliverable, an iOS-application will be made, which is able to propose questions to possibly injured elderly and give a proper response by making use of natural language processing.
Task division
The group was initially divided into three seperate subgroups, which all independently focusses on different subjects, having their own tasks. This is needed to realize an integrated product of the final design at the end. Therefore, the group has been splitted up in such a way, that the subgroups will independently take care of the hardware, the software or the information page of our design.
- Software
- Bram
- Pieter
- Hardware
- Steef
- Man-Hing
- Information page
- Ken
- Everyone
Later on, after changing the general project planning and deliverables, the group has been split up differently. Only one member will be responsible for the development of the application prototype, and the others are going to focus on the literature. The subjects what each member individually has to focus on each week, will be assigned during the group meetings. These subtasks are described in Appendix A. The group has now been split up as follows:
- Application development
- Pieter
Pieter will be responsible for this task, because he already has experience with development of applications, since he is creating iOS-applications for his job.
- Literature
- Ken
- Steef
- Man-Hing
- Lennard
- Bram