= Deadlines =
= Planning =
* February 16th: 2nd Presentation
== Gantt chart ==


= Todo list =
[[File:Gantt_Chart_Group10.jpg | 1340 px]]
 
== Deadlines ==
* Presentations
** Presentation 1:''' February 13, 2017'''
** Presentation 2: '''February 20, 2017'''
** Presentation 3: '''April 03, 2017'''
 
* End-term evaluation (peer-review): '''April 03, 2017'''
 
* Finalize final design: '''April 03, 2017'''
 
* Finalize Wiki-page: '''April 13, 2017'''
 
The stated deadlines will all be graded.
 
== Milestones ==
* Literature study (resp.)
** USE-aspects
** Research
** Technical information
** Completed Wiki-page
 
* Final design (resp.)
** Description (with i.e. preliminary model)
** Speech recognition (A.I.)
** Completed final design
 
== Deliverables ==
* iOS-application (interface)
* Speech recognition component
 
As final deliverable, an iOS-application will be made, which is able to propose questions to possibly injured elderly and give a proper response by making use of natural language processing.
 
== Task division ==
The group was initially divided into three seperate subgroups, which all independently focusses on different subjects, having their own tasks. This is needed to realize an integrated product of the final design at the end. Therefore, the group has been splitted up in such a way, that the subgroups will independently take care of the hardware, the software or the information page of our design.
 
*Software
** Bram
** Pieter
 
*Hardware
** Steef
** Man-Hing
 
*Information page
** Ken
** Everyone
 
Later on, after changing the general project planning and deliverables, the group has been split up differently. Only one member will be responsible for the development of the application prototype, and the others are going to focus on the literature. The subjects what each member individually has to focus on each week, will be assigned during the group meetings. These subtasks are described in [http://cstwiki.wtb.tue.nl/index.php?title=0LAUK0_PRE2016_3_Groep10_Project_progress Appendix A].
The group has now been split up as follows:
 
*Application development
** Pieter
Pieter will be responsible for this task, because he already has experience with development of applications, since he is creating iOS-applications for his job.
 
*Literature
** Ken
** Steef
** Man-Hing
** Lennard
** Bram
 
== Others ==
[http://cstwiki.wtb.tue.nl/index.php?title=PRE2016_3_Groep10#Idea Back to homepage]

Latest revision as of 15:38, 13 April 2017

Planning

Gantt chart

Gantt Chart Group10.jpg

Deadlines

  • Presentations
    • Presentation 1: February 13, 2017
    • Presentation 2: February 20, 2017
    • Presentation 3: April 03, 2017
  • End-term evaluation (peer-review): April 03, 2017
  • Finalize final design: April 03, 2017
  • Finalize Wiki-page: April 13, 2017

The stated deadlines will all be graded.

Milestones

  • Literature study (resp.)
    • USE-aspects
    • Research
    • Technical information
    • Completed Wiki-page
  • Final design (resp.)
    • Description (with i.e. preliminary model)
    • Speech recognition (A.I.)
    • Completed final design

Deliverables

  • iOS-application (interface)
  • Speech recognition component

As final deliverable, an iOS-application will be made, which is able to propose questions to possibly injured elderly and give a proper response by making use of natural language processing.

Task division

The group was initially divided into three seperate subgroups, which all independently focusses on different subjects, having their own tasks. This is needed to realize an integrated product of the final design at the end. Therefore, the group has been splitted up in such a way, that the subgroups will independently take care of the hardware, the software or the information page of our design.

  • Software
    • Bram
    • Pieter
  • Hardware
    • Steef
    • Man-Hing
  • Information page
    • Ken
    • Everyone

Later on, after changing the general project planning and deliverables, the group has been split up differently. Only one member will be responsible for the development of the application prototype, and the others are going to focus on the literature. The subjects what each member individually has to focus on each week, will be assigned during the group meetings. These subtasks are described in Appendix A. The group has now been split up as follows:

  • Application development
    • Pieter

Pieter will be responsible for this task, because he already has experience with development of applications, since he is creating iOS-applications for his job.

  • Literature
    • Ken
    • Steef
    • Man-Hing
    • Lennard
    • Bram