Embedded Motion Control 2014 Group 1/Meeting 20140514: Difference between revisions

From Control Systems Technology Group
Jump to navigation Jump to search
(Created page with 'Meeting 2 date: 14-05-2014 (16.00-17.00) The chosen software architectu')
 
No edit summary
Line 3: Line 3:
date: 14-05-2014 (16.00-17.00)
date: 14-05-2014 (16.00-17.00)


The chosen software architectu
The maze file is up and running. Some fine tuning needs to be done. Thursday evening tests will be done with pico.

Revision as of 10:28, 26 May 2014

Meeting 2

date: 14-05-2014 (16.00-17.00)

The maze file is up and running. Some fine tuning needs to be done. Thursday evening tests will be done with pico.