Embedded Motion Control 2014 Group 1/Meeting 20140512: Difference between revisions
Jump to navigation
Jump to search
(Created page with 'Meeting 2 date: 12-05-2014 The chosen software architecture for the maze competition is strong. For the corridor competition it is not possible to get this architecture up and…') |
No edit summary |
||
Line 7: | Line 7: | ||
Tasks: | Tasks: | ||
Sander: Hough Transform | *Sander: Hough Transform | ||
Richard: Positioning | |||
Joep: Maze Architecture | *Richard: Positioning | ||
Marc + Wouter: Corridor code | |||
*Joep: Maze Architecture | |||
*Marc + Wouter: Corridor code |
Latest revision as of 10:27, 26 May 2014
Meeting 2
date: 12-05-2014
The chosen software architecture for the maze competition is strong. For the corridor competition it is not possible to get this architecture up and running. Because of this reason it is chosen to make a single file for the corridor competition.
Tasks:
- Sander: Hough Transform
- Richard: Positioning
- Joep: Maze Architecture
- Marc + Wouter: Corridor code