PRE2018 3 Group3: Difference between revisions

From Control Systems Technology Group
Jump to navigation Jump to search
Line 43: Line 43:
The past project of PRE2016 3 Group 3 was conducted in a similar design case. Hence, the wiki of this project was analysed along with the 63 references of their wiki page (numbered 1 - 63).
The past project of PRE2016 3 Group 3 was conducted in a similar design case. Hence, the wiki of this project was analysed along with the 63 references of their wiki page (numbered 1 - 63).


Link to the wiki of project group PRE2016 3 Group 3: http://cstwiki.wtb.tue.nl/index.php?title=PRE2016_3_Groep3#Group_3:_Railway_Maintenance_Robots  
* Link to the wiki of project group PRE2016 3 Group 3: http://cstwiki.wtb.tue.nl/index.php?title=PRE2016_3_Groep3#Group_3:_Railway_Maintenance_Robots  
# Smith, O. (2016). No more commuter misery? Trains fight leaves with lasers. Retrieved from http://www.thememo.com/2016/09/12/train-leaves-leaf-zapping-trains-rail-safety-and-standards-board-are-arming-up-with-microwaves-and-lasers/  
# Smith, O. (2016). No more commuter misery? Trains fight leaves with lasers. Retrieved from http://www.thememo.com/2016/09/12/train-leaves-leaf-zapping-trains-rail-safety-and-standards-board-are-arming-up-with-microwaves-and-lasers/  
#: description
#: description

Revision as of 15:33, 9 February 2019

Preface

Group Members

Name Study ID Number
Max Hanssen Industrial Design 1257269
Jorick van Hekke Electrical Engineering 1225185
Suryanto Horlez Computer Science 1286714
Joeri Schults Mechanical Engineering 1266330
Jules Vaes Mechanical Engineering 1263196

Problem statement

The railways in the Netherlands are very vulnerable for all kinds of things. Think for example of fallen leaves, snow, weeds, dead animals, etc. These factors lead to unwanted delays. This autonomous robot is designed to tackle this problem and prevent delays from happening.

Subject

Autonomous railway cleaning robot

Objectives

  • The system must be able to navigate through the Dutch railway system autonomously
  • The system must be able to recognize the different obstacles on the railway
  • The system must be able to clean the railway from obstacles autonomously.
    • For special occasions the system must alert the involved companies
  • The system must provide a short-term solution for certain problems
  • The system must avoid colliding with obstacles
  • The system must be deployable at any time
  • The system must not hinder the human operated train traffic

Users

The NS and ProRail. Indirect users are the train-users.

State of the Art

The past project of PRE2016 3 Group 3 was conducted in a similar design case. Hence, the wiki of this project was analysed along with the 63 references of their wiki page (numbered 1 - 63).

  1. Smith, O. (2016). No more commuter misery? Trains fight leaves with lasers. Retrieved from http://www.thememo.com/2016/09/12/train-leaves-leaf-zapping-trains-rail-safety-and-standards-board-are-arming-up-with-microwaves-and-lasers/
    description
  2. ETS SPOOR B.V. (n.d.). Railmonitor. Retrieved from http://www.etsspoor.nl/producten/meetapparatuur/railmonitor/
    description
  3. Statistics about railway disturbances in the Netherlands. Retrieved from https://www.rijdendetreinen.nl/statistieken/
    description
  4. Different kind of disturbances around railway tracks. Retrieved from https://www.prorail.nl/reizigers/storingen-op-het-spoor/
    description
  5. Article about leaves on the railway tracks. Retrieved from http://www.metronieuws.nl/nieuws/binnenland/2016/11/die-rot-blaadjes-op-het-spoor-waarom-doen-ze-niets/
    description
  6. Smith, O. (2016). No more commuter misery? Trains fight leaves with lasers. Retrieved from http://www.thememo.com/2016/09/12/train-leaves-leaf-zapping-trains-rail-safety-and-standards-board-are-arming-up-with-microwaves-and-lasers/
    description
  7. Sorokanich, B. (2016). This Hand-Held Laser Makes Rust Literally Evaporate. Retrieved from http://www.roadandtrack.com/car-culture/classic-cars/videos/a30597/best-rust-remover-laser/
    description
  8. P-Laser (2017). Laser cleaning applications. Retrieved from http://www.p-laser.com/applications_detail.aspx?AGUID=1f846979-8fea-4745-bcea-663800c027e5&LGUID=8565a502-c109-43ef-b1a1-dfba5f3edbf6/
    description
  9. Schreiner, M. et all (2008) Handbook on the Use of Lasers in Conservation and Conservation Science. Retrieved from http://www.science4heritage.org/COSTG7/booklet/
    description
  10. Vega, R. et all (1990). Laser ice removal system. Retrieved from https://www.google.com/patents/US4900891/
    description
  11. Paper geometry railways. Retrieved from http://crema.di.unimi.it/~fscotti/ita/pdf/Scotti02.pdf/
    description
  12. Paper wear railways. Retrieved from https://docs.google.com/viewer?url=patentimages.storage.googleapis.com/pdfs/US6218961.pdf/
    description
  13. Railway monitor. Retrieved from http://www.etsspoor.nl/producten/meetapparatuur/railmonitor/
    description
  14. Drones with infrared cameras 1. Retrieved from https://www.prorail.nl/nieuws/proef-met-drones-controleren-wisselverwarming-met-infraroodcamera-s/
    description
  15. Drones with infrared cameras 2. Retrieved from https://tweakers.net/nieuws/86694/prorail-zet-drones-in-om-verwarming-van-wissels-te-controleren.html/
    description
  16. Railway switches inspection robot Felix. Retrieved from http://research.loccioni.com/en/robotics/felix/
    description
  17. Europees Spoorweg bureau. System Requirements Specification (SUBSET-026). Paragraph 3.6.5. Retrieved from http://www.era.europa.eu/Document-Register/Pages/Set-3-System-Requirements-Specification.aspx
    description
  18. European Rail Traffic Management System (ERTMS). Retrieved from http://www.railway-technology.com/projects/european-rail-traffic-management-system-ertms/
    description
  19. Falch (2017). cont jet 125 2500-26-0-e. Retrieved from http://www.falch.com/products/g588.html
    description
  20. Baveck Machines (2017). Rail infrastructure - Rust removing brush. Retrieved from http://www.baveck.nl/en/rail-infrastructure/24-rust-removing-brush/
    description
  21. Tackling a leafy issue, Railway Technology, retrieved from http://www.railway-technology.com/features/feature1457/
    description
  22. 22
    description
  23. 23
    description
  24. 24
    description
  25. 25
    description
  26. 26
    description
  27. 27
    description
  28. 28
    description
  29. 29
    description
  30. 30
    description
  31. 31
    description
  32. 32
    description
  33. 33
    description
  34. 34
    description
  35. 35
    description
  36. 36
    description
  37. 37
    description
  38. 38
    description
  39. 39
    description
  40. 40
    description
  41. 41
    description
  42. 42
    description
  43. 43
    description
  44. 44
    description
  45. 45
    description
  46. 46
    description
  47. 47
    description
  48. 48
    description
  49. 49
    description
  50. 50
    description
  51. 51
    description
  52. 52
    description
  53. 53
    description
  54. 54
    description
  55. 55
    description
  56. 56
    description
  57. 57
    description
  58. 58
    description
  59. 59
    description
  60. 60
    description
  61. 61
    description
  62. 62
    description
  63. 63
    description

Approach

We will conduct a study and analysis and will come up with a design. If time allows it, we will make a shitty prototype as well.

Planning

Planning Monday Thursday Remarks
Week 1 Introduction + groups The plan Plan finished before Monday
Week 2 Feedback session + research problem approach Research + contact NS Complete questions for NS
Week 3 Feedback session + research solution Research solutions Complete possible solutions for the system
Week 4 Feedback session + research components Components list Complete possible components for the system
Week 5 Feedback session + integrating integrating Integrate the components in one coherent system
Week 6 Feedback session + budget calculation Extra time to complete the above Gather feedback
Week 7 Feedback session + finalize Finalize + presentation preparation Finish remaining tasks
Week 8 Feedback session + finalize + presentation preparation Finalize + presentation preparation Make sure everything is according to the assignment

Milestones

  • First group meeting with everyone
  • Solutions ready
  • Integrating solution
  • Final report
  • Final design
  • Presentation
  • A program that differentiates glass, plants, snow from the other trash

Deliverables

  • Wiki (report)
  • Final presentation
  • (shitty prototype)

Who will do what

  • Sunny (Computer Science): the software of the design
  • Jorick (Electrical Engineering): the electronic components of the design.
  • Max (Industrial Design): the look and feel of the design.
  • Jules (Mechanical Engineering): the 3D model of the design and the general functioning of the design.
  • Joeri (Mechanical Engineering): the 3D model of the design and the general functioning of the design.
  • Everyone:comment/help on other peoples work

Brainstorm (extra)

Move to logbook

Image: 250 pixels