During the first week of the project, every team member dove into locating and reading online articles and other literature that could be relevant for our research, and a clear planning was yet to be made. After having conducted our research, we had a better idea about what we wanted to do and accomplish in the time we have for this project. There are going to be two deliverables; a literature study and alongside to the a computer model based on existing technology and information.<br>
During the first week of the project, every team member dove into locating and reading online articles and other literature that could be relevant for our research, and a clear planning was yet to be made. After having conducted our research, we had a better idea about what we wanted to do and accomplish in the time we have for this project. There are going to be two deliverables; a literature study and alongside to the a computer model based on existing technology and information.<br>
The milestones set in the planning
For the planning, several subtopics need to be considered and placed in a proper lineup. These topics can overlap, considering multiple team members can work on multiple topics at a time. The milestones are set at specific dates as of now, but aside from the final milestones, these could face minor alterations depending on our experiences during the project.

Revision as of 22:05, 24 February 2018

To go back to the mainpage: PRE2017 3 Groep6.


First of all, this document had to be renamed considering "Project Planning" linked us through to another group's planning page which we could edit as well. This seems more like a bug than a feature.

During the first week of the project, every team member dove into locating and reading online articles and other literature that could be relevant for our research, and a clear planning was yet to be made. After having conducted our research, we had a better idea about what we wanted to do and accomplish in the time we have for this project. There are going to be two deliverables; a literature study and alongside to the a computer model based on existing technology and information.
For the planning, several subtopics need to be considered and placed in a proper lineup. These topics can overlap, considering multiple team members can work on multiple topics at a time. The milestones are set at specific dates as of now, but aside from the final milestones, these could face minor alterations depending on our experiences during the project.