<i>First of all, this document had to be renamed considering "Project Planning" linked us through to another group's planning page which we could edit as well. This seems more like a bug than a feature.</i><br>
<i>First of all, this document had to be renamed considering "Project Planning" linked us through to another group's planning page which we could edit as well. This seems more like a bug than a feature.</i><br>
During the first week of the project, every team member dove into locating and reading online articles and other literature that could be relevant for our research, and a clear planning was yet to be made. After having conducted our research, we had a better idea about what we wanted to do and accomplish in the time we have for this project. There are going to be two deliverables; a literature study and alongside to the a computer model based on existing technology and information.<br>
The milestones set in the planning

Revision as of 22:02, 24 February 2018

To go back to the mainpage: PRE2017 3 Groep6.


First of all, this document had to be renamed considering "Project Planning" linked us through to another group's planning page which we could edit as well. This seems more like a bug than a feature.

During the first week of the project, every team member dove into locating and reading online articles and other literature that could be relevant for our research, and a clear planning was yet to be made. After having conducted our research, we had a better idea about what we wanted to do and accomplish in the time we have for this project. There are going to be two deliverables; a literature study and alongside to the a computer model based on existing technology and information.
The milestones set in the planning