Embedded Motion Control 2017 Group 2 Minutes: Difference between revisions
Jump to navigation
Jump to search
(Created page with '===Meeting 8-5-2017 (Rens)=== - Opzet initial design idea gemaakt. - taakverdeling. ===Meeting 3-5-2017 (Rens)=== - Alle groep leden gaan brainstormen over het design van het…') |
|||
(4 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
===Meeting 8-5-2017 | ===Meeting 8-5-2017=== | ||
*Opzet initial design idea gemaakt. | |||
*Taakverdeling. | |||
===Meeting 3-5-2017 | ===Meeting 3-5-2017=== | ||
*Everyone will think about possible system architectures to solve the maze and corridor challenge | |||
**Firt design is to create a wall follower to solve simple maze problems and get familiar with software. | |||
**Second design aims to create a map of the maze on the fly to solve the maze. | |||
*Research is required on fusing the laser and odometry data to get a better state estimate. | |||
*The visualisation program has to be recreated for debugging purposes. | |||
*For those inexperienced with Git: https://www.youtube.com/watch?v=HVsySz-h9r4 |
Latest revision as of 19:24, 13 May 2017
Meeting 8-5-2017
- Opzet initial design idea gemaakt.
- Taakverdeling.
Meeting 3-5-2017
- Everyone will think about possible system architectures to solve the maze and corridor challenge
- Firt design is to create a wall follower to solve simple maze problems and get familiar with software.
- Second design aims to create a map of the maze on the fly to solve the maze.
- Research is required on fusing the laser and odometry data to get a better state estimate.
- The visualisation program has to be recreated for debugging purposes.
- For those inexperienced with Git: https://www.youtube.com/watch?v=HVsySz-h9r4