Embedded Motion Control 2017 Group 10: Difference between revisions
Jump to navigation
Jump to search
Line 10: | Line 10: | ||
=='''Initial Design'''== | =='''Initial Design'''== | ||
===''Requirements''=== | ===''Requirements''=== | ||
* one | |||
* two | |||
===''Functions''=== | ===''Functions''=== | ||
===''Components''=== | ===''Components''=== |
Revision as of 13:07, 9 May 2017
Group Members
Tim Coerver
Bas Vermij
Pieter de Groot
Jos Terlouw
Corné van Haren
Roel Vromans
Initial Design
Requirements
- one
- two
Functions
Components
Specifications
Interface
Weekly Planning
- finish all tutorials if you dont have already before 8 may.
- Make design document deadline: 10 may
- Think about design.
- Think more about design.
- plan a meeting with our supervisor(s)
- Add everyone to the git repository