0LAUK0 2015 01 Week6: Difference between revisions

From Control Systems Technology Group
Jump to navigation Jump to search
No edit summary
Line 30: Line 30:
|}
|}
'''Week 6''': 05-10-15
'''Week 6''': 05-10-15
= Meetings =
== Monday ==
== Thursday ==
= Plan =


= Progress =
= Progress =

Revision as of 15:35, 18 October 2015

Quick Links
Home
Content Plan Report Simulation
Log Week1 Week2 Week3 Week4 Week5 Week6 Week7

Week 6: 05-10-15

Progress

Kasper Bakker

Frank van Heeswijk

This week I have worked on understanding the code for the simulation, but I have not been able to make extensions to the simulation. Li needed to make some changes to the simulation which he did in the weekend and then I should be able to continue, but Saturday evening I got sick and was not able to finish it in time.

Yuanlong Li

Didn't spent too much time working on the project this week.

-Changed the simulator a bit to make it work with multiple lines. Now we have two lines running in simulator.

-Added a very basic configuration interface

-Added some documentation for the code

-Added general happiness


TODO:

-Make the routes and lines configurable from UI? probably xml or something similar so don't have to modify the code to add new lines and routes

-Add support for exporting result data to Excel

Eric Steenhof

Joey Verest

Eric Wolters

This week wasn't the most productive for me. I finished the survey analysis and added the some things to adress the comments we got back from the feedback session. Furthermore i made a start with writing some text for the simulation part of the report. However Li and Frank will finish it since they know the most about the simulation

Lester Jones

https://www.dropbox.com/s/o29nd3jpdeer72d/EndReport0LAUK0conceptphase.pdf?dl=0 In this link the current state of the report can be found


Started with the past & current attempts.