0LAUK0 2015 01 Week5: Difference between revisions
No edit summary |
|||
(14 intermediate revisions by 4 users not shown) | |||
Line 30: | Line 30: | ||
|} | |} | ||
'''Week 5''': 28-09-15 | '''Week 5''': 28-09-15 | ||
= Progress = | = Progress = | ||
Line 43: | Line 36: | ||
== Frank van Heeswijk == | == Frank van Heeswijk == | ||
Looked into modeling the full system using CIF, read the tutorials extensively. | |||
Ultimately I understood how it would be possible to model single entities (like a bus, passenger or bus stop) using automata, but I failed to see how you would reasonable model a full network of road segments, bus stops, buses and passengers that all need to be connected. | |||
Therefore I think that it is better to continue with our own simulation where we can more easily implement these things. | |||
== Yuanlong Li == | == Yuanlong Li == | ||
Line 61: | Line 56: | ||
There's still a lot to do to make the simulation complete: | There's still a lot to do to make the simulation complete: | ||
1. Currently only a | 1. Currently only a static scheduler is implemented. Dynamic scheduler and multiple routes static scheduler need to be implemented. | ||
2. | 2. Currently only one line is available. | ||
3. | 3. Need to make it configurable. | ||
[[File:0LAUK0_2015_01_Week5_Simulation.gif]] | |||
== Eric Steenhof == | == Eric Steenhof == | ||
Line 73: | Line 70: | ||
Frank, Li, Eric S and I discussed what sort of simulation we want to make and what things we need for the simulation. | Frank, Li, Eric S and I discussed what sort of simulation we want to make and what things we need for the simulation. | ||
Eric S and I chose a existing bus-route in Eindhoven [http://www.hermes.nl/dienstregeling/lijn?id=L003 lijn 3]. The bus-route consist of 18 bus-stops. Eric S and I wrote down the travel time and distance between each bus-stop. | Eric S and I chose a existing bus-route in Eindhoven [http://www.hermes.nl/dienstregeling/lijn?id=L003 lijn 3]. The bus-route consist of 18 bus-stops. Eric S and I wrote down the travel time and distance between each bus-stop. | ||
therefor we used Google earth and the site of Hermes. After that we added the shortcuts with associated distance and time. I made a system in Microsoft Visio, so it's clear and Li and Frank can use it. | therefor we used Google earth and the site of Hermes. After that we added the shortcuts with associated distance and time. I made a system in Microsoft Visio, so it's clear and Li and Frank can use it.(See [[Media:busroute2.png|Bus-route]]) | ||
Our goal next week is to make also the return of the bus-route with shortcuts, and extend the bus-route with other bus-stops. | |||
[[Media:busroute2.png]] | |||
== Eric Wolters == | == Eric Wolters == | ||
This week i worked on analysing the data and reporting the findings in a clear document | |||
== Lester Jones == | == Lester Jones == |
Latest revision as of 15:27, 18 October 2015
Home | |||||||
Content | Plan | Report | Simulation | ||||
Log | Week1 | Week2 | Week3 | Week4 | Week5 | Week6 | Week7 |
Week 5: 28-09-15
Progress
Kasper Bakker
Frank van Heeswijk
Looked into modeling the full system using CIF, read the tutorials extensively. Ultimately I understood how it would be possible to model single entities (like a bus, passenger or bus stop) using automata, but I failed to see how you would reasonable model a full network of road segments, bus stops, buses and passengers that all need to be connected. Therefore I think that it is better to continue with our own simulation where we can more easily implement these things.
Yuanlong Li
-Made a discrete event simulator based on React.NET framework
The simulator is able to simulate multiple buses, bus stops and passengers interacting with each other.
Basically there are 3 different kind of process running in the simulator
1. Bus is keep running around and retrieving next destination from the scheduler interface
2. Passenger is another process trigged by bus at bus stops. On/off action will take certain amount of time for each passenger.
3. Simulator itself acts as environment. It generates passengers using Exponential distribution and step through random time generated using Normal distribution.
There's still a lot to do to make the simulation complete:
1. Currently only a static scheduler is implemented. Dynamic scheduler and multiple routes static scheduler need to be implemented.
2. Currently only one line is available.
3. Need to make it configurable.
Eric Steenhof
Joey Verest
Frank, Li, Eric S and I discussed what sort of simulation we want to make and what things we need for the simulation. Eric S and I chose a existing bus-route in Eindhoven lijn 3. The bus-route consist of 18 bus-stops. Eric S and I wrote down the travel time and distance between each bus-stop. therefor we used Google earth and the site of Hermes. After that we added the shortcuts with associated distance and time. I made a system in Microsoft Visio, so it's clear and Li and Frank can use it.(See Bus-route) Our goal next week is to make also the return of the bus-route with shortcuts, and extend the bus-route with other bus-stops.
Eric Wolters
This week i worked on analysing the data and reporting the findings in a clear document
Lester Jones
Checking the report.
Combining all documents in one report.
Look what still has to be done.