Didn't spent too much time working on the project but have done the following.
Didn't spent too much time working on the project but have done the following.


-Changed the simulator a bit to make it work with multiple lines.
-Changed the simulator a bit to make it work with multiple lines. Now we have two lines running in simulator.


-Added a very basic configuration interface
-Added a very basic configuration interface
Line 62: Line 62:


-Add support for exporting result data to Excel
-Add support for exporting result data to Excel


== Eric Steenhof ==
== Eric Steenhof ==

Revision as of 20:07, 11 October 2015

Quick Links
Home
Content Plan Report Simulation
Log Week1 Week2 Week3 Week4 Week5 Week6 Week7

Week 5: 28-09-15

Meetings

Monday

Thursday

Plan

Progress

Kasper Bakker

Frank van Heeswijk

Yuanlong Li

Didn't spent too much time working on the project but have done the following.

-Changed the simulator a bit to make it work with multiple lines. Now we have two lines running in simulator.

-Added a very basic configuration interface

-Added documentation for the code

-Added general happiness


TODO:

-Make the routes and lines configurable from UI? probably xml or something similar so don't have to modify the code to add new lines and routes

-Add support for exporting result data to Excel

Eric Steenhof

Joey Verest

Eric Wolters

Lester Jones

Started with the past & current attempts.