== Introduction ==
=== Problem Statement ===
=== Objectives ===
== State-of-the-art ==
== USE analysis ==
=== Users ===
=== Society ===
=== Enterprise ===
== Approach ==


==Planning==
==Planning==

Revision as of 13:55, 7 February 2024

Medical Robot

Group Members

Name Student ID Department
Yuting Dong 1546104 Computer Science
Jie Liu 1799525 Computer Science
Zhiyang Zhang 1841734 Mechanical Engineering
Samir Saidi 1548735 Computer Science
Feiyang Yan 1812076 Computer Science
Nikola Mitsev 1679759 Computer Science

Introduction

Problem Statement

Objectives

State-of-the-art

USE analysis

Users

Society

Enterprise

Approach

Planning

We created a plan for the development process of our product based off of the previously described approach. This plan is shown in the Gantt chart below:

A Gantt chart of our development plan.

Task Division

We subdivided the tasks amongst ourselves as follows:

Research Requirements Specification Implementation Testing
Task Group member Task Group member Task Group member Task Group member Task Group member
Define problem statement and objectives Everyone User Analysis Jie Create UML Diagrams Everyone (TBD) Implement the prototype Everyone (TBD) Test the prototype Everyone (TBD)
Setup the Wiki page Yuting Create Survey Jie & Feiyang Define user interface Everyone (TBD) Create formal acceptance test plan Everyone (TBD) Work on presentation Everyone (TBD)
Literature research Everyone Analyse Survey Jie & Feiyang Make a test plan Everyone (TBD) Finalize prototype Everyone (TBD)
Write Section "Approach" Yuting Write Formal Requirements Everyone (TBD) Finalize wiki Everyone (TBD)
Write Section "Planning" Samir
Write Introduction Zhiyang
Write Section "State of the Art" Samir & ... (TBD)
Perform Stakeholder Analysis Everyone
Update Wiki Everyone

Milestones

By the end of Week 1 we should have a solid plan for what we want to make, a brief inventory on the current literature, and a broad overview of the development steps required to make our product.

By the end of Week 3 we should have analysed the needs of our users and stakeholders, formalized these needs as requirements according to the MoSCoW method, and have a clear state-of-the-art.

By the end of Week 4 we should have specified the requirements as UML diagrams, blueprints, etc., created a basic user interface, and created an informal test plan.

By the end of Week 6 we should have created a formal acceptance test plan.

By the end of Week 7 we should have finished the implementation of our product's prototype.

By the end of Week 8 we should have tested the product according to the acceptance test plan, finished the presentation, finalized the prototype, and finalized our report.

Deliverables

The final product will be an Android application, representing the user interface, intended to be used alongside a physical robot which we will specify and try to (partially) implement.

The application will have two views, one for the patient/user, and one for the caretaker/doctor.

The robot will be equipped with a variety of sensors which will relay data to the application and should be capable of interacting with the user(s) and caretaker(s).

Logbook

Week 1

Name Total hours Tasks
Yuting
Jie
Zhiyang
Samir 5 Introduction lecture (1), meeting (1.5), Gantt chart (1), Planning section (1.5)
Feiyang
Nikola