PRE2020 1 Group1: Difference between revisions

From Control Systems Technology Group
Jump to navigation Jump to search
Line 17: Line 17:
|}
|}


== Task division plan 1st week (temporary) ==
= Task division plan 1st week (temporary) =


Problem statement and objectives --> Lieke
Problem statement and objectives --> Lieke
Line 30: Line 30:


SotA: literature study, at least 25 relevant scientific papers and/or patents studied, summary on the wiki! --> Everyone 5 articles. Combining everything --> Davide
SotA: literature study, at least 25 relevant scientific papers and/or patents studied, summary on the wiki! --> Everyone 5 articles. Combining everything --> Davide


== Workload ==
== Workload ==

Revision as of 10:07, 31 August 2020

Group members

Name Student ID Department
Eline 1338447
Davide
Lieke Nijhuis 0943276
Ikira Wortel 1334336
Wout Opdam 1241084 Mechanical Engineering

Task division plan 1st week (temporary)

Problem statement and objectives --> Lieke

Who are the users? --> Ikira

What do they require? --> Wout

Approach, milestones and deliverables --> Eline

Who’s doing what? --> Eline

SotA: literature study, at least 25 relevant scientific papers and/or patents studied, summary on the wiki! --> Everyone 5 articles. Combining everything --> Davide

Workload

An overview of who has done what.


Week 1:

Name Student ID Hours this week Tasks
Eline 1338447
Davide
Lieke Nijhuis 0943276
Ikira Wortel 1334336
Wout Opdam 1241084 Intro videos + first brainstorm (1.5 hours) + Start with wiki layout (1 hour)