Embedded Motion Control 2014 Group 1/Meeting 20140521: Difference between revisions

From Control Systems Technology Group
Jump to navigation Jump to search
No edit summary
No edit summary
 
Line 5: Line 5:
After the corridor challenge it is decided to continue with the previously determined architecture. The following tasks are devided:
After the corridor challenge it is decided to continue with the previously determined architecture. The following tasks are devided:


- Wouter: situation recognition
- Wouter: situation recognition<br>
- Richard: Laser interpretation
- Richard: Laser interpretation<br>
- Sander: Line determination
- Sander: Line determination<br>
- Marc: Drive
- Marc: Drive<br>
- Joep: State machine
- Joep: State machine<br>

Latest revision as of 17:16, 11 June 2014

Meeting 6

date: 21-05-2014

After the corridor challenge it is decided to continue with the previously determined architecture. The following tasks are devided:

- Wouter: situation recognition
- Richard: Laser interpretation
- Sander: Line determination
- Marc: Drive
- Joep: State machine