Embedded Motion Control 2014 Group 1/Meeting 20140521: Difference between revisions
Jump to navigation
Jump to search
(Created page with 'Meeting 6 date: 21-05-2014 Before the corridor challenge some small changes where made with respect to safety and the width of the corridor. During the corridor challenge Pico…') |
(No difference)
|
Revision as of 18:14, 11 June 2014
Meeting 6
date: 21-05-2014
Before the corridor challenge some small changes where made with respect to safety and the width of the corridor.
During the corridor challenge Pico was the fastest to finish the maze. Though we did not know about a speed limit for the robot. Therefore we became first of the groups that drove with a higher speed then the permitted one.