Embedded Motion Control 2014 Group 1/Meeting 20140514: Difference between revisions

From Control Systems Technology Group
Jump to navigation Jump to search
(Created page with 'Meeting 2 date: 14-05-2014 (16.00-17.00) The chosen software architectu')
 
No edit summary
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
Meeting 2
Meeting 3


date: 14-05-2014 (16.00-17.00)
date: 14-05-2014 (16.00-17.00)


The chosen software architectu
The maze file is up and running. Some fine tuning needs to be done. Thursday evening tests will be done with pico.

Latest revision as of 16:57, 11 June 2014

Meeting 3

date: 14-05-2014 (16.00-17.00)

The maze file is up and running. Some fine tuning needs to be done. Thursday evening tests will be done with pico.